Wholesale Toy Outlet-New Products,Low Prices
Wholesale Toy Outlet-New Products,Low Prices Wholesale Toy Outlet-New Products,Low Prices
Home Inflatable Toys Bright Teething Ring
KastKing Kong Saltwater & Freshwater Fishing Rod, Powerful, Lightweight S-Curve Graphite Rod Blanks, Nano Resin Technology, Stainless-Steel Double-Foot Guides w/Titanium Oxide Rings, Non-Slip Handles

KastKing Kong Saltwater & Freshwater Fishing Rod, Powerful, Lightweight S-Curve Graphite Rod Blanks, Nano Resin Technology, Stainless-Steel Double-Foot Guides w/Titanium Oxide Rings, Non-Slip Handles

$ 54.00

$ 90.00

Save: $

Style:
  • A: Spin 7'/M Power/Fast(2pcs)
  • A: Spin 8'/M Power/Fast(2pcs)
  • B: Cast 7'/M Power/Fast(2pcs)
  • B: Cast 7'/Mh Power/Fast(2pcs)
  • A: Spin 7'6"/Mh Power/Fast(2pcs)"
  • B: Cast 7'6"/H Power/Fast(2pcs)"
  • A: Spin 8'/Mh Power/Fast(2pcs)
  • B: Cast 8'/Vh Power/Fast(2pcs)
  • A: Spin 10'/Mh Power/Fast(2pcs)
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

  • Powerful S-Curve Graphite Rod Blanks - KastKing KONG series rods are designed for anglers targeting massive fish in fresh and saltwater! These lightweight, powerful, 100% graphite blanks are made of high-strength S-Curve graphite reinforced with Nano-Resin technology that delivers amazing strength and lifting power but are still incredibly light and sensitive.
  • Stainless-Steel Double Foot Guides – Because KastKing KONG rods are made to handle giant fish, every component must be up to the challenge. We use only stainless-steel, double foot guides because of their strength and each guide has an ultra-smooth Titanium Oxide ring which is designed to perform flawlessly with heavy braided line. The combination of strong frames and durable rings are perfect for extreme conditions.
  • High-Strength Components – When targeting big fish, every component must be up to the challenge. We use extra strong graphite reel seats with nylon reinforcement to ensure that large reels stay secure. Custom handles feature an EVA core for comfort and a rubber cross wrap for durability. Foregrips have a spiral cross wrap with finger slots that provide control over big fish. Some models also include graphite gimbals in the fighting butt.
  • Chartreuse “Strike Tip”- The bright chartreuse “Strike Tip” enhances early strike detection even in low light conditions and quickly alerts you to even the lightest bites, so you never miss a fish. The “Strike Tips” are also great for night fishing but equally well in bright sunlight.
  • Casting and Spinning Models – KastKing KONG Rods are available in both Casting and Spinning models in both 1 and 2 pc. Line ratings range from 15-40 lbs. for the 7’6” spinning model all the way to 50-100 lbs. for the 6’6” 1 pc casting rod. Lure ratings range from 2-8 oz to 8-32 oz. If you are targeting big fish in fresh or saltwater, there is a KastKing KONG rod that will get the job done for you.

You May Also Like

Helicopter Shaped Decanter
Helicopter Shaped Decanter

$ 95.23

Save: $

Platypus Plush Platypus Stuffed Animal,Soft Platypus Toys Cute Platypus Plush Toy,Realistic Animal Plushie Toy for Kids and Adults 100cm/39.4 in/3.28fts
Platypus Plush Platypus Stuffed Animal,Soft Platypus Toys Cute Platypus Plush Toy,Realistic Animal Plushie Toy for Kids and Adults 100cm/39.4 in/3.28fts

$ 54.00

$ 90.00

Save: $

SCHLAGE BE469ZP CAM 605 Connect Smart Deadbolt With Alarm Inbuilt Camelot Trim In Bright Brass
SCHLAGE BE469ZP CAM 605 Connect Smart Deadbolt With Alarm Inbuilt Camelot Trim In Bright Brass

$ 86.00

$ 214.00

Save: $

XTOOL IP500 for BMW OBD2 Scanner, Full Systems Bi-Directional Scan Tool, Battery Registration Tool with ECU Coding, All Reset Services and Injector Coding for BMW/Mini/RR, Lifetime Free Update
XTOOL IP500 for BMW OBD2 Scanner, Full Systems Bi-Directional Scan Tool, Battery Registration Tool with ECU Coding, All Reset Services and Injector Coding for BMW/Mini/RR, Lifetime Free Update

$ 189.00

Save: $

BAMBIX Stirling Engine Motor Model, Stirling Helicopter Engine Model Kit, Functional Mechanical Engine Generator Model, DIY 3D Printed Functional Aircraft Physical Experiment Engine Toy, Medium
BAMBIX Stirling Engine Motor Model, Stirling Helicopter Engine Model Kit, Functional Mechanical Engine Generator Model, DIY 3D Printed Functional Aircraft Physical Experiment Engine Toy, Medium

$ 70.00

$ 156.00

Save: $

R.Vivimos Women's Summer Cotton Lantern Sleeves Ruffled Off Shoulder A-Line Midi Dresses
R.Vivimos Women's Summer Cotton Lantern Sleeves Ruffled Off Shoulder A-Line Midi Dresses

$ 27.00

$ 39.00

Save: $

Buckle-Down Plastic Clip Collar - Checker Bright Pastel - 1" Wide - Fits 11-17" Neck - Medium
Buckle-Down Plastic Clip Collar - Checker Bright Pastel - 1" Wide - Fits 11-17" Neck - Medium

$ 16.00

$ 20.00

Save: $

teytoy Baby Soft Alphabet Cards Toys, 26Pcs ABC Alphabet Flash Cards Early Learning Toy with Storage Bag, Washable Soft letter Toy for Toddlers Kids Boys Girls Over 0 Years
teytoy Baby Soft Alphabet Cards Toys, 26Pcs ABC Alphabet Flash Cards Early Learning Toy with Storage Bag, Washable Soft letter Toy for Toddlers Kids Boys Girls Over 0 Years

$ 19.00

Save: $

Aloderma Basic Aloe Brightening Skin Care Set - 4 Pieces - Cleanser, Cream x 2pcs, 200g Aloe Vera Gel
Aloderma Basic Aloe Brightening Skin Care Set - 4 Pieces - Cleanser, Cream x 2pcs, 200g Aloe Vera Gel

$ 41.00

$ 59.00

Save: $

Remote Control Police Car, 4D Motion Gravity and Steering Wheel Control, 1:12 Scale, 2.4Ghz, with Lights, Sirens, Powered Doors, (TR-911)
Remote Control Police Car, 4D Motion Gravity and Steering Wheel Control, 1:12 Scale, 2.4Ghz, with Lights, Sirens, Powered Doors, (TR-911)

$ 29.00

$ 41.00

Save: $

Cart
Wholesale Toy Outlet-New Products,Low Prices
Your cart is currently empty.